Sikkim Enhances Road Infrastructure for Better Connectivity
Strengthening Sikkim's Road Network
Sikkim Roads and Bridges Minister N.B. Dahal during an inspection across Gyalshing and Soreng districts on Wednesday (Photo: AT)
Gangtok, Sept 23: The government of Sikkim is intensifying its initiatives to enhance road infrastructure and connectivity throughout its mountainous regions. The focus is on completing essential road, bridge, and drainage projects while resolving issues that hinder access to remote areas.
On Wednesday, N.B. Dahal, the Minister for Roads and Bridges, conducted a thorough inspection in the Gyalshing and Soreng districts, assessing the status and condition of vital roadways and urging officials to accelerate unfinished projects.
While examining the Uttarey–Chewabhanjang route leading to the Sikkim-Nepal border, Dahal noted that challenging terrain and geographical limitations had caused delays in construction.
He recognized the setbacks and stated, “Significant hurdles have been cleared, and work is now prioritized to benefit residents in the border areas of Sikkim.”
Dahal instructed the Public Works Department (PWD) to expedite the remaining tasks and ordered the immediate start of the bridge construction over the Isangle Khola at Picharis to ensure uninterrupted connectivity along the border corridor.
The inspection also included the Pelling–Dentam–Uttarey road, where Dahal evaluated the quality of the pavement, slope stability, and drainage systems. He urged engineers to promptly address repairs, uphold construction standards, and eliminate obstacles affecting both residents and visitors.
Additionally, the minister reviewed the Soreng–Zoom and Nayabazaar–Jorethang routes, crucial for daily travel, public transport, and commercial activities between West and South Sikkim. Officials were directed to hasten ongoing projects while ensuring strict quality control.
At the Singla Bridge and Rammam Check Post along the Jorethang–Singla route, Dahal assessed the infrastructure facilitating movement between Sikkim and West Bengal. He emphasized the need for regular structural assessments, proper drainage upkeep, and timely repairs to guarantee safe and smooth traffic flow.
This inspection is part of a broader initiative by the Sikkim government to enhance connectivity across the Himalayan state, especially on routes of strategic and economic importance.
Chief Minister Prem Singh Tamang is also pursuing Central approval for the proposed Chewabhanjang Multimodal Economic Corridor along the Sikkim-Nepal border.
If sanctioned, Chewabhanjang in West Sikkim would serve as the state’s second official international land-trade gateway after Nathu La, potentially positioning Sikkim as one of the few Indian states with two foreign trading posts.
The envisioned corridor aims to bolster cross-border trade, tourism, and regional mobility. Tamang has indicated that this strategic link could shorten travel time from the border to Kathmandu to approximately seven hours, while providing over four million residents in eastern Nepal access to Sikkim’s healthcare and educational facilities in under an hour.
Thus, the proposed corridor significantly contributes to the state’s ongoing commitment to enhancing roads, bridges, and supporting infrastructure, particularly in the challenging terrain of West Sikkim.